At least it fits through the hatch...
and into the keel....
The white tank in the middle will be the bilge pump system.
As a result of the test fit the forward tank will be extended 2" and both tanks reduced in height to 23". Tanks are now gone for construction in 5052-H32 .250 aluminum.
Based on some excellent advice on this blog and elsewhere I will rethink the fuel piping system with an emphasis on KISS.
No comments:
Post a Comment